Remove burner from boiler
Clean primary air combustion fan and housing
Replace burner nozzle this correct size and angle
Clean electrodes, check spark plug - replace if defective
Check flame failure operation and safety cut off
Replace burner oil filter element(s)
Clean all boiler flueways up to and including the first flue bend
Clean combustion space
Inspect refractory brickwork (report if defective)
Refit burner, fire up and test
Carry out full combustion test and record results
Check fire valves for correct operation and condition of firewire
Check boiler plant room ventilation
Check all electrical controls i.e. programmer/time switch
and thermostats
Ensure boiler plant room is left in a clean and tidy condition
Operate header tank and cold water supply tank vall valves
for correct operation
Replace oil tank filter element, if fitted
Check oil line for leaks
Please note that this procedure will vary from one appliance
to another